Sri Shirdi Saibaba Temple Renovations Phase II (Design Build)

DESCRIPTION

Sri Shirdi Saibaba Samasthan (SSSS) wanted to do exterior facade renovations and made a contract with DMC to provide exterior facade renovation. This was a design-build project and DMC was involved in creating the design from concepts.

 

Project Name Sri Shirdi Saibaba Temple Renovations Phase II (Design Build)
DMC's Role General Contractors
Client Sri Shirdi Saibaba Temple
Status July 2013-May 2014

SCOPE OF WORK

  • Demolition
  • Excavation
  • Concrete Works
  • Brickwork
  • Stone Masonry
  • Carpentry
  • Painting
  • Selective demolition of all partition walls and all non-load bearing structures.
  • Earthwork excavation.
  • Constructing concrete floors and ramp.
  • Installing Doors and Windows.
  • Constructing drywall outside and entrance of the building.
  • Painting throughout the exterior portions of the building.
  • Rough and finish carpentry work outside the building.

DMC Finished The Project On Schedule And Budget.

About DMC | Services | Projects | Clients | Opportunities | Newsroom | Contact us

DMC Group, 13500 Foley Street, Detroit, Michigan 48227. | Phone: (313) 491-1815 | Fax: (313) 491-1820 | E-mail: info@dmcgroupusa.com

© 2015 DMC Group. All rights reserved. Privacy Policy | Terms of Use