Scope Of Work
Puritan-Fenkell CSO Facility:
- Removal and replacement of existing concrete sidewalk, including ADA Ramps
- Construction of gravel walkway and steps from control building to outfall
- Regrading soils above CSO basin to provide for positive drainage
- Installation of 8” Perforated HDPE Trench Drain
- Demo and Installation of Fencing around Property
- Installation of dome-topped bollards to illuminate walkways and steps
Leib CSO Facility:
- Installation of 8” storm drain system including Nyoplast drainage structures, corrugated pipes, and cleanouts
- Removal and replacement of existing brick pavers above storm drain system
- Demo and Replacement of wrought iron fence
- Demo and Replacement of concrete walkway, curb, and gutter along existing building
- Updates to chemical containment basin including new curb and installation of new bollards