DMC was contracted for Design-Build services by the City of Detroit to provide a new 6-acre towing lot per GSD requirements. DMC performed a site survey to determine the most effective design for underground detention system, storm sewers, and catch Basins. After permitting, DMC began construction in two phases, which helped to eliminate the disruption of existing operations at the site.
Project Name | Grand River – Tow Yard |
DMC’s Role | GC |
Client | City of Detroit, GSD |
Status | Complete |
Design
Construction