Description

DMC was contracted for Design-Build services by the City of Detroit to provide a new 6-acre towing lot per GSD requirements. DMC performed a site survey to determine the most effective design for underground detention system, storm sewers, and catch Basins. After permitting, DMC began construction in two phases, which helped to eliminate the disruption of existing operations at the site.

Project Name Grand River – Tow Yard
DMC’s Role GC
Client City of Detroit, GSD
Status Complete

Scope Of Work

Design

  • Provide final design plans for developing underground detention system, storm sewers, catch basins, and light poles
  • Permitting through BSEED & DWSD

Construction

  • Site clearing, excavation, site utilities, and grading
  • Site Restoration
  • Inst. of Underground Detention System
  • Inst. of Storm Drainage System incl. (10) Catch Basins
  • Inst. of 21AA Base Installation

The Trade’s includes

  • Site Utilities
  • Electrical
  • Site Improvements
X