WSU – State Hall 4th Floor Renovations

Description

DMC was retained as the Prime Contractor by Wayne State University to renovate 30,000 SF area on the 4th floor. WSU wanted to renovate the entire 4th floor of the State Hall Building to convert it into classrooms, located at 5143 Cass Avenue. All work is performed on Wayne State’s main campus in Detroit Michigan.

There was a lot of coordination required as there were ongoing classes on the other floors during the performance of this contract. We had to pay special attention to shutdowns, construction traffic, dust and noise during the construction phase. This was a Union Job.

DMC has special emphasis on safety on this project. We had zero incidents on this project.

Project Name WSU – State Hall 4th Floor Renovations
DMC’s Role General Contractors
Client Wayne State University
Architect A3C Collaborative Architecture
Status April 2012 – February 2013

Scope Of Work

  • Removal of Interior gypsum board partitions, masonry partitions.
  • Removal of existing Doors, frames, storefront, and hardware.
  • Removal of existing resilient base, carpet, ceramic tile.
  • Removal of existing Suspended acoustical ceilings, gypsum board ceilings.
  • Selective Demolition inside the hall which included East wing and North wing.

Concrete Masonry Work

  • Concrete formwork.
  • Patching of elevated concrete slabs.
  • Concrete reinforcement.
  • Joint devices associated with concrete work.
  • Surface treatments for concrete floors and slabs.
  • Concrete Block.
  • Mortar and Grout.
  • Reinforcement and Anchorage.

Carpentry Work

  • Preservative treated wood materials.
  • Fire retardant treated wood materials.
  • Miscellaneous framing and sheathing.
  • Communications and electrical room mounting boards.
  • Concealed wood blocking, nailers, and supports.
  • Miscellaneous wood nailers, furring, and grounds.

Wood Casework

  • Specially fabricated cabinet units.
  • Countertops and window stools/sills.
  • Cabinet hardware.

Mechanical Work

  • Installing Motors.
  • Pipe Flexible Connectors, Expansion Fittings and Loops.
  • Meters and Gages.
  • Hangers and Supports.
  • Mechanical Identification.
  • Mechanical Insulation.
  • HVAC

Plumbing Work

  • Domestic Water Piping.
  • Domestic Water Piping Specialties.
  • Packaged Booster Pumps.
  • Sanitary Waste and Vent Piping.
  • Drainage Piping Specialties.
  • Storm Drainage Piping.
  • Plumbing Fixtures.
  • Drinking Fountains and Water Coolers.

DMC successfully completed the project on Schedule and Budget.

The Trade’s includes

  • Electrical
  • Mechanical
  • Plumbing
  • Selective Demolition
  • Carpentry
  • Concrete Work
  • Wood Casework
  • Fire System
  • Security System
  • Excavation and Earthwork
  • Low Voltage Raceways