Detroit PAL Renovation

Project Completion Date: 12/3/2025

Description

Detroit PAL Renovation included site clearing; installation of an ADA-accessible ramp and stairs; interior demolition; electrical, plumbing, and HVAC upgrades; construction of a mezzanine storage area and first-floor lobby; storefront installation; and installation of an ADA vertical lift. The project also included renovation of the male and female basement restrooms; cafeteria renovation with new flooring and paint; addition of a food pantry within the cafeteria; renovation of all basement classrooms; conversion of existing showers into a storage room; replacement of an exterior step; removal and replacement of concrete sidewalks at the front and rear of the building; installation of a generator; and installation of new rooftop units (RTUs) with a screen wall.
Project Name Detroit PAL Renovation
DMC’s Role GC
Client Detroit Police Athletic League
Status Complete

Scope Of Work

    • Site clearing and replacement of front and rear concrete sidewalks and exterior steps
    • Installation of ADA-accessible ramp, stairs, and vertical lift
    • Interior demolition and electrical, plumbing, and HVAC upgrades.
    • Construction of first-floor lobby, mezzanine storage area, and new storefront.
    • Renovation of basement restrooms and all basement classrooms.
    • Cafeteria renovation with new flooring, paint, and a new food pantry
    • Installation of generator and new rooftop units (RTUs) with screen wall

The Trades Include

  •  Demolition & Site Clearing
  • Structural Metal Framing
  • Unit Masonry
  • Plumbing
  • Flooring
  • Carpentry
  • Earthworks
  • Electrical
  • Site Improvements
  • HVAC